| 05/06-05 | Martin Luther King Jr. Parkway | Roadside Development |
Bid Recap
|
| 05/06-06 | Un-Coated Oil Rock & Sanding Rock Production | Various Stockpile Sites |
Bid Recap
|
| 05/06-07 | Pre-Coated Oil Rock Production | Various Stockpile Sites |
Bid Recap
|
| 05/06-08 | A.C. Overlays | Crossley Lane, Green Hill Road, Lorane Highway and Maxwell Connector |
Bid Recap
|
| 05/06-10 | Grading, Structure & Paving | Row River Road Bridge - M.P. 16.64 & Sharps Creek Road Bridge - M.P. 6.48 |
Bid Recap
|
| 05/06-11 | A.C. Overlays | Dorsey Lane, Hamm Road and Latham Road |
Bid Recap
|
| 05/06-12 | Short Mountain Landfill | Exposed Geomembrane Cover Construction for Phase I/II Closure |
Bid Recap
|
| 05/06-13 | Bernhardt Heights Road (M.P. 0.58 to M.P. 1.25) | Grading & Drainage |
Bid Recap
|
| 05/06-14 | Sharps Creek Road Bridge - M.P 6.48 | Grading, Structure & Paving |
Bid Recap
|
| 05/06-15 | Coyote Creek Covered Bridge (Bridge No. 18-5W-32) | Structure Repair |
Bid Recap
|
| 05/06-16 | Brice Creek Road Slide Repair at M.P. 6.7 | Grading, Paving & Mechanically Stabilized Earth Wall |
Bid Recap
|
| 06/07-02 | Base Rock Production | West Boundary Road, Stockpile Sites |
Bid Recap
|
| 06/07-03 | Row River Road Bridge @ M.P. 16.64 | Grading, Structure & Paving |
Bid Recap
|
| 0607MS-51 | Rock Materials | N/A |
Not Available
|
| 0607MS-52 | Liquid Asphalt Materials | Delivery, CRC Distributor and Operator |
Bid Recap
|
| 06ms-50 | Dust Abatement Material (Lignin Sulfonate) | Delivery, CRC Distributor and Operator |
Bid Recap
|
| 06ms-53 | Asphaltic Mix Patching Materials | NA |
Bid Recap
|
| AS0607-01 | Request For Professional Services | Professional Services for Development of a Request for Proposal for Cost Accounting Software System |
Not Available
|