| 00/01-01 | Layng & Earnest Covered Bridge | Painting (Br. No. 21-3W-1 and Br. No. 16-1W-8) | 06/30/2000 | 07/21/2000 | Plan Holders |
Bid Recap
|
| 00/01-02 | Marcola Road | Grading, Basing, Paving & Structure (MP 6.22 to 10.45) | 02/09/2001 | 03/09/2001 | Plan Holders |
Bid Recap
|
| 00/01-03 | Base Rock Production | Various Stockpile Sites | 02/16/2001 | 03/02/2001 | Plan Holders |
Bid Recap
|
| 00/01-04 | Layng & Earnest Covered Bridge | *CANCELED* Painting (Br. No. 21-3W-1 and Br. No. 16-1W-8) | 02/23/2001 | 03/30/2001 | Plan Holders |
Not Available
|
| 00/01-05 | A.C. Overlays | Demming, Hamm, W. Sheffler and Wendling Roads | 03/02/2001 | 03/23/2001 | Plan Holders |
Bid Recap
|
| 00/01-06 | A.C. Overlays | Cottage Grove and Creswell Area Roads | 03/16/2001 | 04/06/2001 | Plan Holders |
Bid Recap
|
| 00/01-07 | Oil Rock Production | Various Stockpile Sites | 03/23/2001 | 04/06/2001 | Plan Holders |
Bid Recap
|
| 00/01-08 | Clear Lake Road | Grading, Basing & Paving (M.P. 0.00 to M.P. 1.67) | 03/30/2001 | 04/20/2001 | Plan Holders |
Bid Recap
|
| 00/01-09 | A.C. Overlays | Eugene and Springfield Vicinity Roads | 03/30/2001 | 04/20/2001 | Plan Holders |
Bid Recap
|
| 00/01-10 | Rehabilitation | Ivy Avenue, River Avenue, Silver Lane and Tamarack Street | 06/01/2001 | 06/22/2001 | Plan Holders |
Bid Recap
|
| 01/02-01 | 30th Avenue | Grading, Basing, Paving and Sewers-Gonyea SNE Ramp Extension (MP 1.27 to MP 0.97) | 06/29/2001 | 07/20/2001 | Plan Holders |
Bid Recap
|
| 01/02-03 | Delta Hwy. (ALL BIDS REJECTED) | (M.P. 1.16 to M.P. 1.37) Grading, Basing and Paving | 02/01/2002 | 02/22/2002 | Plan Holders |
Bid Recap
|
| 01/02-05 | Delta Hwy. NE Ramp | Grading, Basing and Paving-MP 1.16-MP 1.37 | 03/15/2002 | 04/05/2002 | Plan Holders |
Bid Recap
|
| 01/02-06 | Marcola Rd. & Mohawk River Br. | Grading, Basing, Paving and Structure | 03/15/2002 | 04/05/2002 | Plan Holders |
Bid Recap
|
| 01/02-07 | A.C. Overlays | Vaughn Road, Fir Butte Road, Fisher Road, Lorane Highway and Prairie Road | 03/22/2002 | 04/12/2002 | Plan Holders |
Bid Recap
|
| 01/02-08 | Oil Rock Production | Various Stockpile Sites | 03/29/2002 | 04/12/2002 | Plan Holders |
Bid Recap
|
| 01/02-09 | Layng, Office, Belknap Covered | Reroofing and Repairs | 04/26/2002 | 05/17/2002 | Plan Holders |
Bid Recap
|
| 01/02-10 | AC Overlays | Jasper-Lowell Rd, Pengra Rd, Big Fall Crk. Rd. | 05/03/2002 | 05/17/2002 | Plan Holders |
Bid Recap
|
| 01/02-11 | Pearl Street (MP 0.28-MP 0.58) | Grading, Basing, Paving, Sewers, Signalization & Landscaping | 05/24/2002 | 06/21/2002 | Plan Holders |
Bid Recap
|
| 01/02-12 | Prairie Rd (MP 1.59 - MP 2.03) | Grading, Basing, Paving & Sewers | 05/31/2002 | 06/21/2002 | Plan Holders |
Bid Recap
|
| 01/02ms-51 | Rock Materials | Establishing Unit Prices | 03/30/2001 | 04/18/2001 | Plan Holders |
Bid Recap
|
| 01/02ms-52 | Liquid Asphalt Materials | Delivery, CRC Distributor & Operator | 04/06/2001 | 04/25/2001 | Plan Holders |
Bid Recap
|
| 01/02ms-53 | Asphaltic Mix Materials | Establishing Unit Prices | 03/30/2001 | 04/18/2001 | Plan Holders |
Bid Recap
|
| 01ms-50 | Dust Oiling Material | (Lignin Sulfonate), Delivery, CRC Distributor & Operator | 03/16/2001 | 04/04/2001 | Plan Holders |
Bid Recap
|
| 02/03-02 | Brice Crk Rd MP 3.6, 4.3, 6.1 | Grading, Basing, Paving & Mechanically Stabilized Earth Wall | 06/14/2002 | 06/28/2002 | Plan Holders |
Bid Recap
|
| 02/03-03 | Jasper-Lowell Rd (MP 10.40 To | Grading, Basing, Paving & Sewers | 08/16/2002 | 08/30/2002 | Plan Holders |
Bid Recap
|
| 02/03-04 | Seavey Way, Frank Parrish Br. | Grading, Structure & Paving | 02/21/2003 | 03/21/2003 | Plan Holders |
Bid Recap
|
| 02/03-05 | Marcola Road | Grading, Drainage & Paving | 03/07/2003 | 03/28/2003 | Plan Holders |
Bid Recap
|
| 02/03-06 | River Rd Area Rehab Projects | AC Overlays | 03/07/2003 | 03/21/2003 | Plan Holders |
Bid Recap
|
| 02/03-07 | East Lane County | A.C. Overlays | 03/28/2003 | 04/11/2003 | Plan Holders |
Bid Recap
|
| 02/03-08 | River Road | Grading, Drainage, Paving & Illumination | 03/28/2003 | 04/18/2003 | Plan Holders |
Bid Recap
|
| 02/03-09 | Oil Rock & Sanding Rock Produc | Various Stockpile Sites | 04/04/2003 | 04/18/2003 | Plan Holders |
Bid Recap
|
| 02/03-10 | Irvington Drive | Grading, Drainage, Paving, Signals & Roadside Development | 04/18/2003 | 05/09/2003 | Plan Holders |
Bid Recap
|
| 02/03-11 | Coyote Cr. & Lake Cr. Cov. Br. | Roofing and Repairs | 05/02/2003 | 05/23/2003 | Plan Holders |
Bid Recap
|
| 02/03ms-51 | Rock Materials | Establishing Unit Prices | 04/05/2002 | 04/24/2002 | Plan Holders |
Bid Recap
|
| 02/03ms-52 | Liquid Asphalt Materials | Delivery, CRC Distributor, & Operator | 04/05/2002 | 04/24/2002 | Plan Holders |
Bid Recap
|
| 02/03ms-53 | Asphaltic Mix Patching Materia | Establishing Unit Prices | 04/05/2002 | 04/24/2002 | Plan Holders |
Bid Recap
|
| 02ms-50 | Dust Oiling Material | (Lignin Sulfonate) Delivery, CRC Distributor and Operator | 03/15/2002 | 04/03/2002 | Plan Holders |
Bid Recap
|
| 03/04-02 | Adams, Gowdyville, London Rds | A.C. Overlays | 06/20/2003 | 07/11/2003 | Plan Holders |
Bid Recap
|
| 03/04-03 | Santa Clara Avenue | Grading, Drainage & Paving | 08/01/2003 | 08/15/2003 | Plan Holders |
Bid Recap
|
| 03/04-06 | High Pass Rd & River Rd | Grading, Drainage, Paving & Signals | 10/31/2003 | 11/21/2003 | Plan Holders |
Bid Recap
|
| 03/04-07 | Clear Lake Rd | Grading & Paving | 11/14/2003 | 12/05/2003 | Plan Holders |
Bid Recap
|
| 03/04-08 | Jasper Road Extension | Grading, Drainage, Paving, Illumination, Signals | 01/02/2004 | 01/23/2004 | Plan Holders |
Bid Recap
|
| 03/04-09 | Oil Rock & Sanding Rock | Various Stockpile Sites | 04/09/2004 | 04/23/2004 | Plan Holders |
Bid Recap
|
| 03/04-10 | AC Overlay | Central Lane County | 04/23/2004 | 05/07/2004 | Plan Holders |
Bid Recap
|
| 03/04-11 | Nelson Mtn Road | Grading, Paving and Structure | 03/31/2004 | 04/23/2004 | Plan Holders |
Bid Recap
|
| 03/04-12 | Stagecoach Road | Grading & Paving | 04/09/2004 | 05/21/2004 | Plan Holders |
Bid Recap
|
| 03/04-13 | Base Rock Production | Various Stockpile Sites | 05/14/2004 | 06/04/2004 | Plan Holders |
Bid Recap
|
| 03/04ms-51 | Rock Materials | Rock Materials | 04/04/2003 | 04/30/2003 | Plan Holders |
Bid Recap
|
| 03/04ms-52 | Liquid Asphalt Materials | Materials, Delivery, CRC Distributor & Delivery | 05/02/2003 | 05/21/2003 | Plan Holders |
Bid Recap
|
| 03M&S-53 | Asphaltic Mix Patching Materia | Asphaltic Mix Patching Materials | 05/02/2003 | 05/21/2003 | Plan Holders |
Bid Recap
|
| 03ms-50 | Dust Abatement Material | Dust Abatement Material, Delivery, CRC Distributor & Operator | 03/21/2003 | 04/09/2003 | Plan Holders |
Bid Recap
|
| 04/05-01 | AC OVERLAYS | Layng Rd, Siuslaw Rd, & Wolf Crk. Rd | 06/18/2004 | 07/02/2004 | Plan Holders |
Bid Recap
|
| 04/05-02 | A.C. Overlays | West Lane County | 07/02/2004 | 07/16/2004 | Plan Holders |
Bid Recap
|
| 04/05-03 | Clear Lake Road, Gibbs Ck. Br. | Grading, Structure and Paving | 01/07/2005 | 01/28/2005 | Plan Holders |
Bid Recap
|
| 04/05-04 | North Game Farm Road | Grading, Paving, Illumination, Signals, Roadside Development | 01/21/2005 | 02/18/2005 | Plan Holders |
Bid Recap
|
| 04/05-05 | Stagecoach Rd, MP 0.22 To 0.56 | Grading & Paving | 02/04/2005 | 02/25/2005 | Plan Holders |
Bid Recap
|
| 04/05-06 | A.C. Overlays | Leaburg Dam Road, London Road & South 6th Street | 02/18/2005 | 03/11/2005 | Plan Holders |
Bid Recap
|
| 04/05-07 | Un-Coated Oil Rock & Sanding Rock Production | Furnish and Deliver Rock to Various Stockpile Sites | 02/18/2005 | 03/11/2005 | Plan Holders |
Bid Recap
|
| 04/05-08 | Pre-Coated Oil Rock Production | Furnish and Deliver Rock to Various Stockpile Sites | 02/18/2005 | 03/11/2005 | Plan Holders |
Bid Recap
|
| 04/05-09 | Cedar Flat Road (M.P. 0.00 To M.P. 0.48) | Grading & Paving | 02/25/2005 | 03/25/2005 | Plan Holders |
Bid Recap
|
| 04/05-10 | Shoestring Road (M.P. 2.8 To M.P. 3.0) | Grading & Paving | 03/18/2005 | 04/08/2005 | Plan Holders |
Bid Recap
|
| 04/05-11 | Martin Luther King, Jr. Parkway | Grading, Drainage, Structures, Paving, Illumination & Signals | 04/15/2005 | 05/12/2005 | Plan Holders |
Bid Recap
|
| 04/05-12 | Jasper - Lowell Road (M.P. 10.57 TO M.P. 10.84) | Grading, Paving & Utility Relocation | 05/06/2005 | 05/27/2005 | Plan Holders |
Bid Recap
|
| 04/05-13 | South 42nd Street, Jasper Road To Mt. Vernon Road | Grading, Drainage, Paving, Illumination And Roadside Development | 05/16/2005 | 06/16/2005 | Plan Holders |
Bid Recap
|
| 04/05M&S-51 | Rock Materials | Materials | 03/26/2004 | 04/14/2004 | Plan Holders |
Bid Recap
|
| 04/05M&S-52 | Liquid Asphalt Materials | Materials, CRC Distributor & Operator | 04/02/2004 | 04/21/2004 | Plan Holders |
Bid Recap
|
| 04/05M&S-53 | Asphaltic Mix Patching Materia | Materials, CRC Distributor & Operator | 04/09/2004 | 04/28/2004 | Plan Holders |
Bid Recap
|
| 04M&S-50 | Dust Abatement Material | Materials, CRC Distributor & Operator | 03/19/2004 | 04/07/2004 | Plan Holders |
Bid Recap
|
| 04ms-53 | Asphaltic Mix Patching Materia | Materials | 11/21/2003 | 12/10/2003 | Plan Holders |
Bid Recap
|
| 05/06-01 | DORENA COVERED BRIDGE (BRIDGE NO. 21-2W-24) | BRIDGE REPAIR | 07/08/2005 | 07/29/2005 | Plan Holders |
Not Available
|
| 05/06-04 | Turtle Creek Subdivision Streets | Grading, Drainage, Paving & Illumination | 08/19/2005 | 09/02/2005 | Plan Holders |
Bid Recap
|
| 05/06-05 | Martin Luther King Jr. Parkway | Roadside Development | 12/16/2005 | 01/10/2006 | Plan Holders |
Bid Recap
|
| 05/06-06 | Un-Coated Oil Rock & Sanding Rock Production | Various Stockpile Sites | 01/27/2006 | 02/10/2006 | Plan Holders |
Bid Recap
|
| 05/06-07 | Pre-Coated Oil Rock Production | Various Stockpile Sites | 01/27/2006 | 02/10/2006 | Plan Holders |
Bid Recap
|
| 05/06-08 | A.C. Overlays | Crossley Lane, Green Hill Road, Lorane Highway and Maxwell Connector | 03/03/2006 | 03/17/2006 | Plan Holders |
Bid Recap
|
| 05/06-10 | Grading, Structure & Paving | Row River Road Bridge - M.P. 16.64 & Sharps Creek Road Bridge - M.P. 6.48 | 03/17/2006 | 04/07/2006 | Plan Holders |
Bid Recap
|
| 05/06-11 | A.C. Overlays | Dorsey Lane, Hamm Road and Latham Road | 04/21/2006 | 05/05/2006 | Plan Holders |
Bid Recap
|
| 05/06-12 | Short Mountain Landfill | Exposed Geomembrane Cover Construction for Phase I/II Closure | 03/24/2006 | 04/21/2006 | Plan Holders |
Bid Recap
|
| 05/06-13 | Bernhardt Heights Road (M.P. 0.58 to M.P. 1.25) | Grading & Drainage | 04/10/2006 | 04/28/2006 | Plan Holders |
Bid Recap
|
| 05/06-14 | Sharps Creek Road Bridge - M.P 6.48 | Grading, Structure & Paving | 05/05/2006 | 05/19/2006 | Plan Holders |
Bid Recap
|
| 05/06-15 | Coyote Creek Covered Bridge (Bridge No. 18-5W-32) | Structure Repair | 05/26/2006 | 06/09/2006 | Plan Holders |
Bid Recap
|
| 05/06-16 | Brice Creek Road Slide Repair at M.P. 6.7 | Grading, Paving & Mechanically Stabilized Earth Wall | 05/30/2006 | 06/16/2006 | Plan Holders |
Bid Recap
|
| 0506ms-51 | Rock Materials | N/A | 03/25/2005 | 04/13/2005 | Plan Holders |
Bid Recap
|
| 0506ms-51A | Rock Materials | N/A | 04/29/2005 | 05/18/2005 | Plan Holders |
Bid Recap
|
| 0506ms-52 | Liquid Asphalt Materials | Delivery, CRS Distributor & Operator | 04/01/2005 | 04/20/2005 | Plan Holders |
Bid Recap
|
| 0506ms-53 | Asphaltic Mix Patching Materials | NA | 04/08/2005 | 04/27/2005 | Plan Holders |
Bid Recap
|
| 05MS-50 | Dust Abatement Material (Lignin Sulfonate) | Delivery, CRC Distributor and Operator | 03/18/2005 | 04/06/2005 | Plan Holders |
Not Available
|
| 06/07-02 | Base Rock Production | West Boundary Road, Stockpile Sites | 10/06/2006 | 10/20/2006 | Plan Holders |
Bid Recap
|
| 06/07-03 | Row River Road Bridge @ M.P. 16.64 | Grading, Structure & Paving | 10/13/2006 | 10/27/2006 | Plan Holders |
Bid Recap
|
| 06/07-05 | Pre-Coated Oil Rock Production | Various Stockpile Sites | 02/02/2007 | 02/16/2007 | Plan Holders |
Bid Recap
|
| 06/07-06 | Un-Coated Oil Rock & Sanding Rock Production | Various Stockpile Sites | 02/02/2007 | 02/16/2007 | Plan Holders |
Bid Recap
|
| 06/07-07 | A.C. Overlays | Marcola Road M.P. 11.75 To M.P. 16.08 | 02/09/2007 | 03/02/2007 | Plan Holders |
Bid Recap
|
| 06/07-08 | A.C. Overlays | Beacon Drive West, Camp Creek Road and Siuslaw Road | 02/16/2007 | 03/09/2007 | Plan Holders |
Bid Recap
|
| 06/07-09 | A.C. Overlays | Big Fall Creek Road and Seavey Loop Road | 03/23/2007 | 04/06/2007 | Plan Holders |
Bid Recap
|
| 06/07-11 | A.C. Overlays | Dane Lane, Love Lake Road and Warthen Road | 04/27/2007 | 05/11/2007 | Plan Holders |
Bid Recap
|
| 06/07-13 | Bob Straub Parkway, S. 57th Street to Jasper Road | Grading, Drainage, Paving, and Signal | 05/11/2007 | 06/08/2007 | Plan Holders |
Bid Recap
|
| 06/07-14 | West Springfield Slurry Seal | N/A | 06/08/2007 | 06/22/2007 | Plan Holders |
Bid Recap
|
| 06/07-RFPS | Request For Professional Services | On-Call Bridge Design & Other Civil Engineering Services | 04/18/2007 | 05/18/2007 | Plan Holders |
Not Available
|
| 0607MS-51 | Rock Materials | N/A | 03/24/2006 | 04/12/2006 | Plan Holders |
Not Available
|
| 0607MS-52 | Liquid Asphalt Materials | Delivery, CRC Distributor and Operator | 03/31/2006 | 04/19/2006 | Plan Holders |
Bid Recap
|
| 06ms-50 | Dust Abatement Material (Lignin Sulfonate) | Delivery, CRC Distributor and Operator | 03/17/2006 | 04/05/2006 | Plan Holders |
Bid Recap
|
| 06ms-53 | Asphaltic Mix Patching Materials | NA | 05/05/2006 | 05/24/2006 | Plan Holders |
Bid Recap
|
| 07/08-01 | London Road | Grading, Structures and Paving, Bridge-MP 8.73, Bridge-MP 11.25, Bridge-MP 13.01 | 06/08/2007 | 06/29/2007 | Plan Holders |
Bid Recap
|
| 07/08-02 | Request for Proposal and Specifications | Parking Facilities Administration Services for Lane County Parks | 07/22/2007 | 08/03/2007 | Plan Holders |
Not Available
|
| 07/08-03 | Request for Proposal | Cost Accounting Software | 09/04/2007 | 09/28/2007 | Plan Holders |
Not Available
|
| 07/08-04 | Request for Professional Services | Alcohol & Drug Testing and CDL Physicals | 10/22/2007 | 10/15/2007 | Plan Holders |
Not Available
|
| 07/08-05 | Prairie View Affordable Housing - Unthank Street | Grading, Drainage, Paving, and Illumination | 12/07/2007 | 12/21/2007 | Plan Holders |
Bid Recap
|
| 07/08-06 | A.C. Overlays | Briggs Hill Road, Bushnell Lane, Bushnell Lane East, Coburg Road and County Farm Road | 01/11/2008 | 02/01/2008 | Plan Holders |
Bid Recap
|
| 07/08-07 | A.C. Overlays | Cottage Grove - Lorane Road and Sears Road | 02/01/2008 | 02/22/2008 | Plan Holders |
Bid Recap
|
| 07/08-08 | Oil Rock & Sanding Rock Production | Various Stockpile Sites | 02/01/2008 | 02/22/2008 | Plan Holders |
Bid Recap
|
| 07/08-09 | Heather Glen Affordable Housing | Grading, Drainage, Sewers, Waterlines, and Paving | 03/21/2008 | 04/18/2008 | Plan Holders |
Bid Recap
|
| 07/08-10 | Bolton Hill Road | Grading, Drainage, Sewers and Paving | 04/04/2008 | 04/25/2008 | Plan Holders |
Bid Recap
|
| 07/08-11 | River Road Area Rehabilitation Project | Grading, Drainage, and Paving | 05/09/2008 | 05/23/2008 | Plan Holders |
Bid Recap
|
| 07/08-13 | Slurry Seal | River Road Area | 05/30/2008 | 06/13/2008 | Plan Holders |
Bid Recap
|
| 07/08ms-51 | Rock Materials | Materials & Supplies | 03/23/2007 | 04/11/2007 | Plan Holders |
Bid Recap
|
| 07/08ms-52 | Liquid Asphalt Materials | Delivery, CRC Distributor and Operator | 03/30/2007 | 04/18/2007 | Plan Holders |
Bid Recap
|
| 07/08ms-53 | Asphaltic Mix Patching Materials | Materials & Supplies | 05/04/2007 | 05/23/2007 | Plan Holders |
Bid Recap
|
| 07MS-50 | Dust Abatement Material (Lignin Sulfonate) | Delivery, CRC Distributor and Operator | 03/16/2007 | 04/04/2007 | Plan Holders |
Bid Recap
|
| 08-MS-50 | Dust Abatement Materal (Lignin Sulfonate) | Delivery, CRC Distributor, and Operator | 03/14/2008 | 04/02/2008 | Plan Holders |
Bid Recap
|
| 08/09-01 | Request for Professional Services | For Devopment & Review of a System Development Charge (SDC) Proposal for Lane County | 04/14/2008 | 05/27/2008 | Plan Holders |
Not Available
|
| 08/09-02 | Armitage Park | Grading, Paving, Sewers, Electrical, Waterlines and Irrigation System | 06/20/2008 | 07/03/2008 | Plan Holders |
Bid Recap
|
| 08/09-03 | Harvey Road | Grading, Drainage, Waterlines, Paving and Beacons. Harvey Road (M.P. 0.00 to M.P. 1.44) December 2008 | 11/28/2008 | 12/19/2008 | Plan Holders |
Bid Recap
|
| 08/09-04 | Delta Administration Building | Landscaping & Irrigation System | 11/14/2008 | 12/05/2008 | Plan Holders |
Bid Recap
|
| 08/09-06 | Pre-Coated Oil Rock Materials | Various Stockpile Sites | 02/20/2009 | 03/06/2009 | Plan Holders |
Bid Recap
|
| 08/09-07 | Un-Coated Oil & Sanding Rock Materials | Various Stockpile Sites | 02/20/2009 | 03/06/2009 | Plan Holders |
Bid Recap
|
| 08/09-08 | A.C. Overlays #1 | Deerhorn Road, Mosby Creek Road and Row River Road | 03/13/2009 | 03/27/2009 | Plan Holders |
Bid Recap
|
| 08/09-09 | 2009 Preservation Project | Clear Lake Road and Lancaster Drive | 04/17/2009 | 05/01/2009 | Plan Holders |
Bid Recap
|
| 08/09-10 | River Road Area
Slurry Seal Project | River Road Area Slurry Seal Project | 05/01/2009 | 05/15/2009 | Plan Holders |
Bid Recap
|
| 08/09-11 | River Road Area Micro-Surfacing Project | Micro-Surfacing Project June 2009 | 05/29/2009 | 06/12/2009 | Plan Holders |
Bid Recap
|
| 0809-MS-51 | Rock Materials | NA | 03/21/2008 | 04/09/2008 | Plan Holders |
Bid Recap
|
| 0809-MS-52 | Liquid Asphalt Materials | NA | 03/28/2008 | 04/16/2008 | Plan Holders |
Bid Recap
|
| 0809-MS-53 | Asphaltic Mix Patching Materials | NA | 05/02/2008 | 05/21/2008 | Plan Holders |
Bid Recap
|
| 09-M&S-50 | Dust Abatement Material (Lignin Sulfonate), Delivery, CRC Distributor and Operator | Materials & Supplies | 03/13/2009 | 04/21/2009 | Plan Holders |
Bid Recap
|
| 09/10-04 | School Zone Flashing Beacon Installation | Wilkes Dr., Hayden Bridge Rd., E. Saginaw Rd., Mosby Creek Rd., Latham Rd., London Rd. & Row River Rd. | 07/31/2009 | 10/23/2009 | Plan Holders |
Not Available
|
| 0910-06 | Jasper-Lowell Road (M.P. 2.50 to M.P. 3.00) | Grading, Structures, Paving & Guardrail | 01/29/2010 | 02/19/2010 | Plan Holders |
Bid Recap
|
| 0910-07 | AC Overlay | Enterprise Road and Little Fall Creek Road | 02/26/2010 | 03/12/2010 | Plan Holders |
Bid Recap
|
| 0910-09 | City of Lowell | Grading, Drainage, Sewers, Paving, Illumination and Water Wetleau Drive | 01/22/2010 | 03/05/2010 | Plan Holders |
Bid Recap
|
| 0910-10 | Pre-Coated Oil Rock Materials | Various Stockpile Sites | 02/19/2010 | 03/05/2010 | Plan Holders |
Bid Recap
|
| 0910-11 | Un-Coated Oil and Sanding Rock | Various Stockpile Sites | 02/19/2010 | 03/05/2010 | Plan Holders |
Bid Recap
|
| 0910-12 | Broadway Area Redevelopment, Veneta, Oregon | Grading, Drainage, Sewers, and Paving Broadway Area Redevelopment Veneta, Oregon | 02/05/2010 | 02/25/2010 | Plan Holders |
Bid Recap
|
| 0910-13 | Shoreview Drive | AC Overlay Shoreview Drive (M.P. 0.000 To M.P. 6.526) | 04/02/2010 | 04/16/2010 | Plan Holders |
Bid Recap
|
| 0910-14 | Veneta Transit Center | Grading, Drainage, Paving, Illumination, and Landscaping | 05/20/2010 | 06/10/2010 | Plan Holders |
Bid Recap
|
| 0910-15 | 2010 Santa Clara Area | Slurry Seal Project | 05/21/2010 | 06/04/2010 | Plan Holders |
Bid Recap
|
| 0910-16 | Irving Road | A.C. Overlay (M.P. 0.064 to M.P. 1.258) | 06/11/2010 | 06/25/2010 | Plan Holders |
Bid Recap
|
| 0910-MS-51 | Rock Materials | Materials & Supplies | 03/20/2009 | 04/08/2009 | Plan Holders |
Bid Recap
|
| 0910-MS-52 | Liquid Asphalt Materials | Delivery, CRC Distributor & Operator | 03/27/2009 | 04/22/2009 | Plan Holders |
Bid Recap
|
| 0910-MS-53 | Asphaltic Mix Patching Materials | Materials & Supplies | 05/01/2009 | 05/20/2009 | Plan Holders |
Bid Recap
|
| 10-MS-50 | Dust Abatement Material (Lignin Sulfonate) | Delivery, CRC Distributor, and Operator | 03/19/2010 | 04/07/2010 | Plan Holders |
Bid Recap
|
| 1011-01 | Hayden Bridge Way Landscaping | Roadside Development | 07/23/2010 | 08/06/2010 | Plan Holders |
Bid Recap
|
| 1011-03 | RFP - Sweet Creek Road Retaining Wall Replacement | Replace existing retaining wall on Sweet Creek Road, adjacent to the Siuslaw River. RFP seeks a full service consultant team that can provide environmental documentation, engineering design and construction engineering support services for this project. | 10/01/2010 | 11/02/2010 | Plan Holders |
Bid Recap
|
| 1011-04 | Irving Rd. - Prairie Rd. Intersection | Grading and Paving | 11/19/2010 | 12/10/2010 | Plan Holders |
Bid Recap
|
| 1011-05 | Camas Swale Rd. & Hamm Rd. | Paving | 01/14/2011 | 01/28/2011 | Plan Holders |
Bid Recap
|
| 1011-06 | Culvert Replacement Five Rivers Road | M.P. 1.75, 2.50, 2.72, 3.13, 3.90 & 5.18 | 03/25/2011 | 04/15/2011 | Plan Holders |
Bid Recap
|
| 1011-07 | Junction City Area Overlays | Paving | 02/04/2011 | 02/18/2011 | Plan Holders |
Bid Recap
|
| 1011-08 | Purchase of Five (5) Precast Concrete Arch-Span Culverts | Material & Services Contract | 03/24/2011 | 04/07/2011 | Plan Holders |
Bid Recap
|
| 1011-09 | Rock Production Un-Coated Oil Rock & Sanding Rock Materials | Various Stockpile Sites | 02/25/2011 | 03/11/2011 | Plan Holders |
Bid Recap
|
| 1011-10 | Eugene & Springfield Area Pavement Preservation | Grading & Paving | 03/18/2011 | 04/07/2011 | Plan Holders |
Bid Recap
|
| 1011-11 | RFP - Stormwater Utility Feasibility Study | Phase 1 | 01/07/2011 | 02/01/2011 | Plan Holders |
Bid Recap
|
| 1011-12 | 2011 Slurry Seal Project | Slurry Seal | 05/27/2011 | 06/10/2011 | Plan Holders |
Bid Recap
|
| 1011-13 | Marcola Road - Shadows Drive to Maple Lane | Paving | 06/03/2011 | 06/17/2011 | Plan Holders |
Bid Recap
|
| 1011-MS-51 | Rock Materials | Materials & Supplies | 03/26/2010 | 04/14/2010 | Plan Holders |
Bid Recap
|
| 1011-MS-52 | Liquid Asphalt Materials | Delivery, CRC Distributor and Operator | 02/05/2010 | 02/24/2010 | Plan Holders |
Bid Recap
|
| 1011-MS-53 | Asphaltic Mix Patching Materials | Materials & Supplies | 04/30/2010 | 05/19/2010 | Plan Holders |
Bid Recap
|
| 11-MS-50 | Dust Abatement Material (Lignin Sulfonate) | Delivery, CRC Distributor, and Operator | 03/18/2011 | 04/06/2011 | Plan Holders |
Bid Recap
|
| 1112-02 | Winberry Creek Road, Big Fall Creek Road to Peninsula Road | Paving | 07/01/2011 | 07/15/2011 | Plan Holders |
Bid Recap
|
| 1112-03 | Purchase of Rotationally Molded Dock Float Drums | Richardson Marina Dock Replacement Project | 09/14/2011 | 10/05/2011 | Plan Holders |
Bid Recap
|
| 1112-04 | Purchase of Steel Float Frames | Richardson Marina Dock Replacement Project | 09/21/2011 | 10/12/2011 | Plan Holders |
Bid Recap
|
| 1112-05 | Richardson Park Marina Boat Dock Replacement | Boat Dock Replacement | 09/28/2011 | 10/26/2011 | Plan Holders |
Bid Recap
|
| 1112-06 | Row River Road Overlay | Paving Row River Road (M.P. 2.1 to M.P. 4.8 and M.P. 12.0 to M.P. 16.6) | 03/02/2012 | 03/16/2012 | Plan Holders |
Bid Recap
|
| 1112-07 | Central Lane Overlays | Paving | 03/30/2012 | 04/13/2012 | Plan Holders |
Bid Recap
|
| 1112-08 | Bolton Hill Rd. & Pine Grove Rd. Overlays | Paving | 05/04/2012 | 05/18/2012 | Plan Holders |
Bid Recap
|
| 1112-09 | Un-Coated Oil Rock & Sanding Rock Materials | Various Stockpile Sites | 03/16/2012 | 03/30/2012 | Plan Holders |
Bid Recap
|
| 1112-10 | Pre-Coated Oil Rock Materials | Various Stockpile Sites | 03/16/2012 | 03/30/2012 | Plan Holders |
Bid Recap
|
| 1112-11 | Sweet Creek Retaining Wall Replacement | Grading, Drainage, Structures, Paving and Signing | 05/18/2012 | 06/15/2012 | Plan Holders |
Bid Recap
|
| 1112-12 | 2012 Slurry Seal Project | Slurry Seal | 06/08/2012 | 06/22/2012 | Plan Holders |
Bid Recap
|
| 1112-MS-51 | Rock Materials | Provide unit prices for various classes of rock and mineral aggregates. | 03/25/2011 | 04/13/2011 | Plan Holders |
Bid Recap
|
| 1112-MS-52 | Liquid Asphalt Materials | Delivery, CRC Distributor and Operator | 02/25/2011 | 03/16/2011 | Plan Holders |
Bid Recap
|
| 1112-MS-53 | Asphaltic Mix Patching Materials | Establish unit prices for LCPW Asphaltic Mix Patching Material needs during the period of July 1, 2011 to June 30, 2012. | 04/22/2011 | 05/11/2011 | Plan Holders |
Bid Recap
|
| 1213-02 | Central Receiving Station Pit Building Residing | Residing 8,096 square feet of metal siding on one side of one existing structure, located at the Glenwood Receiving Station in Eugene, Oregon | 12/28/2012 | 01/16/2013 | Plan Holders |
Bid Recap
|
| 1213-03 | Paving | Bailey Hill Rd. & Warthen Rd. Overlay | 03/01/2013 | 03/15/2013 | Plan Holders |
Bid Recap
|
| 1213-04 | Paving | Row River Rd. Overlay | 04/05/2013 | 04/19/2013 | Plan Holders |
Bid Recap
|
| 1213-05 | Paving | Canary Road Overlay | 04/19/2013 | 05/10/2013 | Plan Holders |
Bid Recap
|
| 1213-06 | Un-Coated Oil Rock & Sanding Rock Materials | Various Stockpile Sites | 03/15/2013 | 03/29/2013 | Plan Holders |
Bid Recap
|
| 1213-07 | Pre-Coated Oil Rock Materials | Various Stockpile Sites | 03/15/2013 | 03/29/2013 | Plan Holders |
Bid Recap
|
| 1213-MS-51 | Rock Materials | Establish unit prices for Lane County Public Works rock material needs for the 2012-2013 fiscal year | 03/23/2012 | 04/11/2012 | Plan Holders |
Bid Recap
|
| 1213-MS-52 | Liquid Asphalt Materials | Delivery, CRC Distributor and Operator | 04/27/2012 | 05/16/2012 | Plan Holders |
Bid Recap
|
| 1213-MS-53 | Asphaltic Mix Patching Materials | For establishing unit prices for Lane County Public Works Asphaltic Mix Patching Materials | 04/20/2012 | 05/09/2012 | Plan Holders |
Bid Recap
|
| 1314-MS-51 | Annual Price Agreement for Purchase Rock Materials | To establish unit prices for LCPW rock material needs for the 2013-2014 fiscal year. | 04/19/2013 | 05/08/2013 | Plan Holders |
Bid Recap
|
| 1314-MS-52 | Annual Price Agreement for Liquid Asphalt Materials | For establishing unit prices for LCPW liquid asphalt material, delivery, CRC distributor and operator needs during fiscal year 2013 - 2014 | 04/19/2013 | 05/08/2013 | Plan Holders |
Bid Recap
|
| 1314-MS-53 | Annual Price Agreement for Asphaltic Mix Patching Materials | To establish unit prices for LCPW Asphaltic Mix Patching Material needs during the period of July 1, 2013 to June 30, 2014. | 04/19/2013 | 05/08/2013 | Plan Holders |
Bid Recap
|
| 2004RFPS-Bridges | 2004 RFPS - Bridges | Request For Professional Services - On Call Bridge Design | 04/02/2004 | 04/23/2004 | Plan Holders |
Not Available
|
| 2009-02 | Pioneer Parkway EmX Bus Rapid Transit Project | Grading, Drainage, Paving & Illumination (International Way Segment) | 01/02/2009 | 01/30/2009 | Plan Holders |
Bid Recap
|
| 99/00-04 | Base Rock Production | Various Stockpile Sites | 02/18/2000 | 03/03/2000 | Plan Holders |
Bid Recap
|
| 99/00-05 | Sears Road Bridge | Grading, Basing, Paving and Structure | 02/28/2000 | 03/17/2000 | Plan Holders |
Bid Recap
|
| 99/00-06 | A.C. Overlays | Franklin Blvd. East, Spencer Creek Road, Green Hill Road, Ellmaker Road, Huston Road North and Royal Avenue | 02/28/2000 | 03/17/2000 | Plan Holders |
Bid Recap
|
| 99/00-07 | A.C. Overlays | London Road, Shoestring Road, Cloverdale Road and Place Road | 03/06/2000 | 03/24/2000 | Plan Holders |
Bid Recap
|
| 99/00-08 | Rhododendron Drive Culvert | Grading, Basing, Paving and Structure | 03/06/2000 | 03/24/2000 | Plan Holders |
Bid Recap
|
| 99/00-09 | Oil Rock Production | Various Stockpile Sites | 03/17/2000 | 03/31/2000 | Plan Holders |
Bid Recap
|
| 99/00-10 | A.C. Overlays | Springfield Area Streets | 04/24/2000 | 05/12/2000 | Plan Holders |
Bid Recap
|
| 99/00-11 | Green Hill Road | Grading, Basing, Paving & Structure, Realignment From Fiddler's Green to Airport Road (M.P. 2.6 to M.P. 0.0) | 05/01/2000 | 05/26/2000 | Plan Holders |
Bid Recap
|
| 99/00-12 | Coburg Road | Sewers, Grading, Basing, Paving and Street Lighting (M.P. 3.27 - M.P. 4.83) | 05/15/2000 | 06/09/2000 | Plan Holders |
Bid Recap
|
| 99/00-13 | A Street | (Ash Meadows) Sewers, Grading, Basing, Paving and Street Lighting | 05/26/2000 | 06/16/2000 | Plan Holders |
Bid Recap
|
| AS0607-01 | Request For Professional Services | Professional Services for Development of a Request for Proposal for Cost Accounting Software System | 11/19/2006 | 12/15/2006 | Plan Holders |
Not Available
|
| RFP | School Zone Flashing Beacon System | Request for proposal for engineering design, furnishing and installing all materials, equipment, labor, and incidentals necessary to complete the work for a school zone flasher system. | 04/13/2010 | 05/21/2010 | Plan Holders |
Bid Recap
|
| W910-02 | Pre-Engineered Metal Buildings - Glenwood Central Receiving Station | Project consists of the general construction services for two (2) new pre-engineered metal buildings, and residing and reroofing one (1) existing structure, located at the Glenwood Central Receiving Station, 3100 East 17th Ave., Eugene, Oregon. | 05/28/2010 | 06/17/2010 | Plan Holders |
Bid Recap
|
| WM06/07-10 | Short Mountain Landfill | Phase V Liner, Phase I/II Final Closure, Wetlands Construction, Camas Swale Temporary Bridge and Haul Road | 03/23/2007 | 04/20/2007 | Plan Holders |
Bid Recap
|
| wm0809-07 | Short Mountain Landfill, Phase III Final Closure | Excavation, Grading, Geomembrane Supply & Installation | 04/17/2009 | 05/12/2009 | Plan Holders |
Bid Recap
|